Water Supply, Wastewater Pumping and Sewerage Studies in the Municipality of Folegandros

Client

Year of Implementation

2020-2022

Client

Year of Implementation

2020-2022

Break Even Consulting has supported the Municipality of Mandra-Eidyllia in the design and construction of sanitation infrastructure, ensuring the safe disposal of wastewater in the municipality’s residential areas. The environmentally safe management of wastewater in the area of the Workers’ Housing Complexes of the Municipality of Mandra-Eidyllia is expected to provide multiple benefits to daily life and the financial activities of local residents, as well as to improve their quality of life.

Description

The proposed projects for the Municipality of Folegandros include:

Solution

Within the framework of the project “Sewerage Network Study for the Settlement of Agkali, Folegandros Island”, the proposed works are:

Within the framework of the project “Water Supply Network Study for the Chora Settlement of Folegandros Island”, the proposed works are:

Within the framework of the project “Hydraulic Study for the Supply and Installation of a Wastewater Pumping Station with a Capacity of 600 m³/day in Chora, Folegandros Island”, the proposed works are:

Project Photos

Indicators

0 m
Networks
0 m3
Useful Reservoir Capacity
Drinking Water Adequacy
ΠΡΟΣΦΑΤΑ ΕΡΓΑ
ΕΞΕΙΔΙΚΕΥΟΜΑΣΤΕ

ΤΟΜΕΙΣ ΔΡΑΣΤΗΡΙΟΤΗΤΑΣ

Δείτε όλους τους τομείς στους οποίους δραστηριοποιείται η Break Even Consulting
ΠΡΟΤΕΙΝΟΥΜΕ

Επικοινωνήστε μαζί μας

Γίνετε μέλος ενός μεγάλου δικτύου επιχειρήσεων και οργανισμών που εμπιστεύονται την Break Even Consulting

Γίνετε μέλος ενός μεγάλου δικτύου επιχειρήσεων και οργανισμών που εμπιστεύονται τη Break Even Consulting