You are here:

Sewerage Studies in the Municipality of Mandra-Eidyllia

Client

Year of Implementation

2022

Client

Year of Implementation

2022

Break Even Consulting has supported the Municipality of Mandra-Eidyllia in the design and construction of sanitation infrastructure, ensuring the safe disposal of wastewater in the municipality’s residential areas. The environmentally safe management of wastewater in the area of the Workers’ Housing Complexes of the Municipality of Mandra-Eidyllia is expected to provide multiple benefits to daily life and the financial activities of local residents, as well as to improve their quality of life.

Description

Regarding the sewerage works under study in the Workers’ Housing Complexes of the Municipality of Mandra-Eidyllia, the company successfully studied the replacement of a section of the wastewater sewerage network, as well as the extension of the wastewater sewerage network. The total length of the pipelines is 3,800 m.

The wastewater collection network of the Workers’ Housing Complexes ultimately discharges through the existing wastewater network of EYDAP into the Wastewater Treatment Center (KEL).

Solution

Within the framework of the project “Supply and installation of a wastewater pumping station with a capacity of 1,000 m³/day in the area of Neo Limani Symis,” the proposed works are

Project Photos

Indicators

0 m
Pipeline Network
0
Private Connections
Quality of Life
ΠΡΟΣΦΑΤΑ ΕΡΓΑ
ΕΞΕΙΔΙΚΕΥΟΜΑΣΤΕ

ΤΟΜΕΙΣ ΔΡΑΣΤΗΡΙΟΤΗΤΑΣ

Δείτε όλους τους τομείς στους οποίους δραστηριοποιείται η Break Even Consulting
ΠΡΟΤΕΙΝΟΥΜΕ

Επικοινωνήστε μαζί μας

Γίνετε μέλος ενός μεγάλου δικτύου επιχειρήσεων και οργανισμών που εμπιστεύονται την Break Even Consulting

Γίνετε μέλος ενός μεγάλου δικτύου επιχειρήσεων και οργανισμών που εμπιστεύονται τη Break Even Consulting