You are here:

Final Study for the Upgrade of the Wastewater Treatment Unit at the Thessaloniki Business ParkTitle (Div)

Client

Year of Implementation

2024

Client

Year of Implementation

2024

Break Even Consulting is undertaking the design of a modern wastewater infrastructure system for the Thessaloniki Business Park, aiming to upgrade and replace the existing systems, which have been operating for many years without maintenance.

Through the upgrade of the Wastewater Treatment Unit and the replacement of sections of the wastewater transport system (pumping stations and force mains), ETVA S.A. ensures both economic and environmental benefits.

Description

As part of the wastewater infrastructure design, our company follows the methodology outlined below:

Solution

The Final Study for the wastewater infrastructure of the Thessaloniki Business Park includes the detailed design and hydraulic sizing of:

  • Upgrade works for the Wastewater Treatment Unit
  • Replacement works for pressurised wastewater pipelines
  • Structural and electromechanical improvement works for the three existing pumping stations
  • Digital upgrade works

The Final Study also includes the preparation of Tender Documents.

Project Photos

Indicators

Increase in the number of businesses at the Thessaloniki Business Park
Reduction in energy consumption through the use of new pumping units and WWTP equipment
Economic and environmental benefits
ΠΡΟΣΦΑΤΑ ΕΡΓΑ
ΕΞΕΙΔΙΚΕΥΟΜΑΣΤΕ

ΤΟΜΕΙΣ ΔΡΑΣΤΗΡΙΟΤΗΤΑΣ

Δείτε όλους τους τομείς στους οποίους δραστηριοποιείται η Break Even Consulting
ΠΡΟΤΕΙΝΟΥΜΕ

Επικοινωνήστε μαζί μας

Γίνετε μέλος ενός μεγάλου δικτύου επιχειρήσεων και οργανισμών που εμπιστεύονται την Break Even Consulting

Γίνετε μέλος ενός μεγάλου δικτύου επιχειρήσεων και οργανισμών που εμπιστεύονται τη Break Even Consulting